Location Weishan | Area 300000 ㎡ |
Model ZGR-150IIAD | |
The Clean Energy Heating Station project in Huancheng Town, Weishan County, covers a total heating area of 300,000 square meters in two communities, namely, Buzhai and Xiaotun villages. It employs nearly a hundred 52P OUTES ultra-low-temperature air-source heat pump units, with radiators installed at the terminals. The indoor temperature is designed to be maintained at 18±2℃, ensuring the daily heating needs of the residents. |